Skip to end of banner
Go to start of banner

How to Move a Pipeline

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

You may want to move pipelines from one project to another.

To move a pipeline to a different project:

  • In Manager, select the checkbox next to the pipeline name and click Move.
  • In Designer, open the pipeline to move and click Move pipeline on the toolbar. You can filter the destination list by entering the project name in the text box.


When moving a pipeline that contains references, the references are treated as follows:

  • If the reference is to an asset in the Shared folder, leave the reference as is.
  • If the reference is to an asset in another project from the target project:
    • If the reference to a file is absolute, keep it.
    • If there is an asset with the same label in the destination project, reference the asset in the destination project.
    • If not and there is an asset with the same label in the shared project, reference the asset in the shared project.
    • If the asset doesn't exist with that label, blank out the field.
  • When moving a pipeline with one or more nested pipelines, move the nested pipelines before moving the parent pipeline.




  • No labels