When moving a pipeline that contains references, the references are treated as follows: - If the reference is to an asset in the Shared folder, leave the reference as is.
- If the reference is to an asset in another project from the target project:
- If the reference to a file is absolute, keep it.
- If there is an asset with the same label in the destination project, reference the asset in the destination project.
- If not and there is an asset with the same label in the shared project, reference the asset in the shared project.
- If the asset doesn't exist with that label, blank out the field.
- When moving a pipeline with one or more nested pipelines, move the nested pipelines before moving the parent pipeline.
|