...
With a Pipeline open in Designer, you can select from the Snaplex drop-down menu a Snaplex on which the Pipeline should run.
Info |
---|
Only Snaplexes placed in the global |
When you configure a Scheduled or Triggered Task, you can select the Snaplex to run the Pipeline.
When using the Pipeline Execute Snap,
The Pipeline Execute Snap has a Snaplex field that specifies the child Pipeline’s Snaplex. leave the field blank.
As an alternative, use the pipe.plexPath expression to ensure that the child Pipeline runs on the same node as the parent.
if you specify a different Snaplex to run a child Pipeline, then the input documents and Pipeline parameters are passed through the Control Plane using encrypted transport to a node in the designated Snaplex.
...
To set a dedicated Snaplex for a project, an Org admin can move a Snaplex from the Shared project to any other project. Only In Manager and Designer, only those Pipelines within the new project have access to that Snaplex. Regardless However, regardless of the Project containing the Snaplex, you can use a Snaplex if you’re the owner.still run Pipelines on it as long as you have access.
The parameter
runtime_path_id
allows users to specify the Snaplex for OAuth2 operations in the Snap. This availability ensures that the refresh token is sent to the nodes in the given Snaplex.
Info |
---|
The runtime_path_id enhancement is currently available for REST and API Suites Snap Packs. |