Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Table of Contents
minLevel1
maxLevel2

Overview

The SnapLogic Release process accommodates user testing of new features on the UAT control plane. The UAT control plane is intended exclusively for testing Pipelines pipelines and Tasks tasks with new features and, and therefore, is separate from Elastic and EMEA.

In the quarterly release, a version of the software is available in the UAT control plane a week before the GA date of the release. The EMEA Control Plane is updated the day after the GA date of the release and is a fully supported production environment. The GA version becomes available on the UAT control plane, and Snap Pack updates happen during the release of the patches to that release.

Info

We strongly recommend that you only use the UAT control plane during the UAT period for a specific release. After the GA of a release, the Snaplex versions on the UAT control plane might change.

This article describes the process of testing new SnapLogic features on the UAT control plane.

...

Once your Org is provisioned on the UAT control plane, you can create new Project Spaces and Assets for testing your Pipelines and Tasks. Alternatively, you can download your projects and assets , and then migrate them to the UAT control plane using the import and export functionalities in Manager.

...

  1. Export your Pipelines from your Orgs in Elastic by doing one of the following:

    • If GitHub integration /wiki/spaces/AP/pages/543817729 is configured for your Org, you can use the GitHub sync feature to synchronize your Pipelines and Assets on Elastic and UAT control planes.

    • Export projects from your Production Org. The project downloads as a zipped file of all the Assets contained within that project. You can then import the project zip file into your UAT Org.
      Note: You must reconfigure your Accounts once you import them into your Org on the UAT control planes.

    • Manually migrate your Pipelines Use the export and import functions.

      1. Use the export function in Designer to download each Pipeline.

      2. Import each Pipeline into the Designer for your Org.

      3. You can download most files from Manager and upload them to your Org in UAT.

  2. Update all the SnapLogic Account configuration information in the UAT Org.

    1. Find all the target Accounts that are required for your UAT Org.

    2. Create the Accounts in your UAT Org.

  3. Run and test Pipelines by validating and executing them in Designer.

  4. Run your Tasks and monitor them on Dashboard or the Studio Execution Overview.