Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: PSWAT-1213

On this Page

Table of Contents
maxLevel2

Overview

Scheduled Tasks are Pipelines that are invoked on a Schedule. You can create a Scheduled Task in Designer or Manager.  In Designer, you can create a Task in an open Pipeline on the canvas, then select to schedule a one-time execution on a fixed date and time, or a recurring execution on an interval or using a more complex schedule like a cron job. Alternatively, you can also create or update a Scheduled Task in Manager and assign the underlying Pipeline to the Scheduled Task. Once the Scheduled Task is created, you can monitor it in the SnapLogic Dashboard.

Key Features

Advanced Scheduling Logic for Repeatable Jobs. You can create cron jobs based on calendar dates, clock time, frequency, end dates, and across time zones.

Blackout Dates. You can apply exceptions (through selected dates) during which the Pipeline is not invoked. This functionality is useful for planned outages or holidays.


Panel
bgColor#ebf7e1

Articles in this section

Child pages (Children Display)
depth2



Scheduled Task Workflow


Prerequisites

  • You must have permissions to Project Space and Project to create and update Scheduled Tasks
  • You must have a Cloudplex or Groundplex set up to run a Scheduled Tasks successfully.


Support and Limitations

  • A Scheduled Task can take up to 10 minutes past the scheduled time to execute. If it misses that window, the task does not execute. 
  • If a Pipeline run is skipped because another instance is already running, the job history shows only the first skip. Subsequent job skips do not appear in the job history.
  • If your account is locked or your password expired, your Scheduled Tasks will fail to execute.


Known Issues

  • When creating a Task and selecting the America/Mexico City time zone, the task runtime is off by one hour. Since Mexico City no longer observes daylight savings, the current implementation of CDT (aligned with CST) might assume that Mexico City changed time zones as it did in the past.
    Workaround: Upgrade your Snaplex to a JDK 11.0.18+ version.
  • Scheduled Tasks that are migrated to a different Project do not reset their run counters.
  • Scheduled Tasks continue executing, even when the frequency for a task is updated from 1 minute to 1 week.
  • If your Org uses the Snaplex-based Scheduler, disabling and then enabling a Scheduled Task should prevent the Task from executing while disabled, but it does not.
  • When creating iterative Scheduled Tasks in time zone regions that have Daylight Savings, we recommend that you select the Cron Job option. See best practices for details.
  • When you create a Triggered Task and change the Run Policy to Scheduled, the Triggered Task URLs are not disabled. Therefore, the underlying pipeline is still executable through the Triggered Task URLs, even though the Task is now a Scheduled Task.

    Workaround: create a new Scheduled Task asset referencing the target pipeline and disable or delete the Triggered Task.