Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Excerpt

To move a pipeline to a different project:

  • In Manager, select the checkbox next to the pipeline name and click Move.
  • In Designer, open the pipeline to move and click Move pipeline on the toolbar. You can filter the destination list by entering the project name in the text box.


Info

When moving a pipeline that contains references, the references are treated as follows:

  • If the reference is to an asset in the Shared folder, leave the reference as is.
  • If the reference is to an asset in another project from the target project:
    • If the reference to a file is absolute, keep it.
    • If there is an asset with the same label in the destination project, reference the asset in the destination project.
    • If not and there is an asset with the same label in the shared project, reference the asset in the shared project.
    • If the asset doesn't exist with that label, blank out the field.
  • When moving a pipeline with one or more nested pipelines, move the nested pipelines before moving the parent pipeline.

Filter by label (Content by label)
showLabelsfalse
max5
spacesSPD
showSpacefalse
sortmodified
reversetrue
typepage
cqllabel in ("pipeline","execute","run") and type = "page" and space = "SPD"
labelspipeline run execute

...

hiddentrue

...