Skip to end of banner
Go to start of banner

Create a Pipeline

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 25 Next »

Creating a new Pipeline consists of the following activities:

  • Opening a Pipeline canvas in SnapLogic Designer

  • Configuring two or more linked Snaps together to orchestrate a flow of data between endpoints

To create a new Pipeline:

  1. In Designer, click (blue star) to open the Add New Pipeline dialog:

    Add pipeline


    The Add New Pipeline dialog opens:

  2. Modify the Label (Pipeline name).
    The names of assets, projects, or project spaces are limited to UTF-8 alphanumeric characters and these special characters: !"$%&'()*+,-.:;<=>@[]^_`{|}~.

  3. If you plan to save this Pipeline to a different Project from the one you last accessed, select the path to the target Project

  4. To make this a Resumable Pipeline, select Resumable Mode.

  5. Optionally, click (blue star) and add key/value pairs to define the following Pipeline Properties:

    • Error Pipeline Parameters

    • Parameters

    • Expression libraries

  6. Click Save. You now have a blank canvas to build your Pipeline.

  7. If you want to modify settings or add parameters, click (blue star) to open the Edit Pipeline Properties dialog.

You can always add and remove parameters for your Pipeline in Designer after the Pipeline is saved.

Use the Snap Reference documentation to do the following:

  • Determine the Snaps you need to use to build your Pipeline.

  • Gather Account information required to connect to your endpoints.

All Snap Packs and their Snaps feature a dedicated documentation page.


Related Content

  • No labels