Skip to end of banner
Go to start of banner

Importing and Exporting Projects

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 19 Next »

In this article

Overview

You can export a Project in the form of a Zip file containing all of the Pipelines, files, Flows, Accounts, and Tasks associated with the Project. Pipeline dependencies, such as child Pipelines and related accounts, are maintained during export. Accounts are exported only when the Org supports encryption. SnapLogic, by default, has Standard Account Encryption (SAE) across all Orgs, unless an Org has opted for Enhanced Account Encryption. In SAE, accounts are encrypted with keys managed in the cloud. 

Exporting Projects

  • Before exporting a Project, ensure that all the Pipelines in the Project are saved and closed.
  • The maximum number of files you can export at one time is 200.

To export a Project:

  1. In SnapLogic Manager, hover your cursor over the Project you want to export, and click . The Project menu appears:


  2. Click Export from the dropdown list. The Export <Project Space>/<Project Name> dialog appears:


  3. Select the Asset types that you want to export. Pipeline, Task, Account, and Flows options are selected by default. You can select All to export all Assets or deselect any Asset types from the Project export. 

  4. Click Export to download the Project as a Zip file.

Importing Projects

To import a Project:

  1. In SnapLogic Manager, hover your cursor over the Project Space in which you want to import the Project and click . This displays the Project dropdown.


  2. Click Import. This displays the Import Project dialog:


  3. Click Choose File to upload the Project files:
    1. Import Project Zip File*
    2. Import Account JSON File (optional)
    3. Import Expression Library Zip File (optional)

  4. When the upload is complete, click Import. A confirmation message appears on the page, and the new Project appears in the list of Projects on the left. 
    You might need to do the following:
    • Add files that are referenced if they were not a part of the Project's export.

    • Edit the Tasks to select the Snaplex on which they must run. 

Important

  • References to assets in the Project remain unchanged.
  • If you are importing a Project with the same name as one that already exists, (n) is appended to the project name for each time it is imported, starting with n=1.
  • The platform reports an error if you try to import a project Zip file > 100MB
  • No labels