You may want to can move pipelines Pipelines from one project to another.
Info |
---|
|
From September 2022 onward, use Manager to move and delete your Pipelines. |
Excerpt |
---|
To move a pipeline Pipeline to a different projectProject: - In Manager,
select - navigate to the Project that contains the Pipeline to move.
- Select the checkbox next to the
pipeline - Pipeline name
and click Move- .
- In
Designer, open - the
pipeline to move and click Move pipeline on the toolbar. You can filter the destination list by entering the project name in the text box. Info |
---|
When moving a pipeline that contains references, the references are treated as follows: - If the reference is to an asset in the Shared folder, leave the reference as is.
If the reference is to an asset in another project from the target project:- If the reference to a file is absolute, keep it.
- If there is an asset with the same label in the destination project, reference the asset in the destination project.
- If not and there is an asset with the same label in the shared project, reference the asset in the shared project.
- If the asset doesn't exist with that label, blank out the field.
When moving a pipeline with one or more nested pipelines, move the nested pipelines before moving the parent pipeline- toolbar, click Image Added.
The Choose Destination Project for Move dialog opens: Image Added - Select the global shared folder or expand the available Project Spaces to select the destination Project.
- Click Move.
Manager moves the Pipeline and displays the Assets for the destination Project.
|