Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

You may want to can move pipelines Pipelines from one project to another.

Info
titleIIP Redesign

From September 2022 onward, use Manager to move and delete your Pipelines.


When moving a pipeline that contains references, the references are treated as follows:

  • If the reference is to an asset in the Shared folder, leave the reference as is.
  • If the reference is to an asset in another project from the target project:
    • If the reference to a file is absolute, keep it.
    • If there is an asset with the same label in the destination project, reference the asset in the destination project.
    • If not and there is an asset with the same label in the shared project, reference the asset in the shared project.
    • If the asset doesn't exist with that label, blank out the field.
  • When moving a pipeline with one or more nested pipelines, move the nested pipelines before moving the parent pipeline
    1. toolbar, click Image Added.
      The Choose Destination Project for Move dialog opens:
      Image Added
    2. Select the global shared folder or expand the available Project Spaces to select the destination Project.
    3. Click Move
      Manager moves the Pipeline and displays the Assets for the destination Project.


    Excerpt

    To move a pipeline Pipeline to a different projectProject:

    1. In Manager,
     select
    1. navigate to the Project that contains the Pipeline to move.
    2. Select the checkbox next to the
    pipeline
    1. Pipeline name
    and click Move
    1. .
    2. In
    Designer, open
    1. the
    pipeline to move and click Move pipeline on the toolbar. You can filter the destination list by entering the project name in the text box.
    Info