Skip to end of banner
Go to start of banner

Moving a Pipeline

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 14 Next »

You can move Pipelines from one project to another.

IIP Redesign

From September 2022 onward, use Manager to move and delete your Pipelines.


To move a Pipeline to a different project:

  1. In Manager, navigate to your project.
  2. Select the checkbox next to the Pipeline name.
  3. Click.

References in Pipelines

When moving a Pipeline that contains references, you should handle the references as follows:

  • If the reference is to an Asset in the shared folder, leave the reference as is.
  • If the reference is to an Asset in a different project from the target project:
    • If the reference to a file is absolute, keep it.
    • If there is an Asset with the same label in the destination project, reference the Asset in the destination project.
    • If there is no Asset with the same label in the destination project but there is an Asset with the same label in the shared project, reference the Asset in the shared project.
    • If the Asset doesn't exist with the same label, blank out the field.

  • When moving a Pipeline with one or more nested Pipelines, move the nested Pipeline before moving the parent Pipeline.




  • No labels